“IEA Hydrogen Projects Database (June 2026): Holland Hydrogen 1; owner/partners: Shell, Gasunie; Netherlands; status: Under construction; online: 2025.”
“and a project of Shell in Germany to expand the 10 MW “REFHYNE” electrolyser already operating at its Rheinland refinery.”
“Shell’s Polaris project, with an undisclosed hydrogen production capacity, which will capture 650 kt of CO2 from the Scotford refinery and chemicals complex (Canada).”
“In Europe, Shell’s Holland Hydrogen I in the Netherlands (200 MW) will have a capacity ten times that of Europe’s largest existing plant, and is aiming to supply an existing refinery by 2025.”
“The gas partial oxidation (POx) process developed by Shell is reported to yield overall plant capture rates up to 99%.”
“In July 2022, Shell New Energies, Engie, Vopak and Anthony Veder signed an agreement to study the feasibility of hydrogen liquefaction and transport of 100 tpd from Sines (Portugal) to Rotterdam (Netherlands), with the potential to scale up over time.”
“Shell’s Holland Hydrogen I (200 MW), which took a final invesment decisions in July 2022”
“Shell’s 200 MW Holland Hydrogen 1, was weld-connected to the network.”
“The gas partial oxidation (POx) process developed by Shell is reported to yield overall plant capture rates up to 99%”